Chapter 8
Well Control Operations and Blowout Protection Equipment
Section 1. Well Control. Well control shall be maintained as needed for the type of operation pursuant to the American Petroleum Institute (API) RP 49 (2013) for Well Control Operations as it applies to their operation.
Section 2. Blowout Protection Equipment.
(a) While a well is being drilled, tested, completed, reconditioned, or is otherwise being worked on, blowout prevention equipment shall be installed and used in accordance with recognized standards and shall be reasonably adequate
(b) CBMNG drilling shall require the use of well pressure control equipment specifically designed and manufactured for such use.