CHAPTER 7
ELECTRICAL PERMITS AND INSPECTIONS
Section 1. Permits.
(a) An electrical wiring permit shall be obtained prior to beginning any new construction or remodeling of any building, mobile home, or premises if the remodeling will require a public utility to connect or disconnect and restore electrical power. This section does not apply in municipalities and counties granted local enforcement authority for electrical safety standards under W.S. 35-9-121.
(b) Permits shall be obtained prior to the start of any installation requiring a permit pursuant to W.S. 35-9-120. Failure to obtain a permit prior to the starting of the electrical installation may result in criminal penalties as set forth in W.S. 35-9-130. Failure to obtain an electrical permit prior to the starting of electrical installation may result in revocation or suspension of Wyoming electrical license.
(c) Electrical permits may be obtained from the Chief Electrical Inspector, or may be made available through the local utility, local governmental agencies, or other entities, as determined by the Chief Electrical Inspector.
(d) A fee established by State Statute shall be paid for any electrical wiring permit issued by the Department. The electrical wiring permit fee shall be included in the fee for guaranteed inspections.
Section 2. Inspections.
(a) Requested electrical inspections shall be made within five (5) business days of the request by the electrical contractor, the general contractor, or the owner. Unless previous arrangements have been made, the person requesting the inspection shall pay for the inspection.
(b) Electrical inspections may be made for any electrical wiring permit issued. These inspections may be made at any time during construction, or within thirty (30) days after completion of the installation for which an electrical wiring permit or plan review was performed.
(c) When serious or hazardous conditions are discovered upon inspection, the permittee shall be notified by email or sent by certified mail return receipt requested or by regular mail with delivery confirmation service requested, which details the serious or hazardous conditions. A copy of the inspection report shall also be attached. The utility shall be copied with the same letter and report sent by certified mail return receipt requested or by regular mail with delivery confirmation service requested.
(d) Electrical permits for temporary power will be issued for a period of ninety (90) days as set forth in Article 305 of The National Electrical Code, unless the permittee requests a longer duration. An electrical wiring permit is required for a temporary service.
(e) All wiring permits issued to homeowners as contractors shall be a guaranteed inspection permit.
Section 3. Inspection Fees
(a) Residential fees as established by State Statute
(b) Commercial & Industrial fees as established by the Department
120/208 120/208
or 240v or 240v 480v over
1 Phase 3 Phase 3 phase 480v
60 amp $ 50.00 $ 50.00 $ 50.00 $ 50.00
100 amp 60.00 65.00 70.00 70.00
125 amp 70.00 75.00 80.00 82.50
150 amp 80.00 85.00 90.00 95.00
200 amp 100.00 105.00 110.00 120.00
225 amp 110.00 115.00 120.00 132.50
300 amp 130.00 140.00 150.00 170.00
400 amp 170.00 185.00 200.00 220.00
600 amp 220.00 250.00 270.00 320.00
800 amp 300.00 330.00 360.00 420.00
1000 amp 370.00 410.00 450.00 520.00
1200 amp 440.00 480.00 520.00 620.00
1600 amp 600.00 640.00 680.00 820.00
2000 amp 800.00 850.00 900.00 1020.00
2500 amp 1000.00 1050.00 1100.00 1270.00
3000 amp 1200.00 1250.00 1360.00 1520.00
4000 amp 1600.00 1700.00 1850.00 2020.00
5000 amp 2000.00 2150.00 2350.00 2520.00